Gold from Clogau’s Shaft 2 floor, with 1.7 tonnes now in pilot processing

An initial 100kg sample of historic floor material from around Shaft 2 at Clogau-St David’s has returned 0.81 grams of gold after processing and refining. Equates to 8.1 g/t if repeated across a 1-tonne sample. It was a sighter, a small preliminary sample, and it has given us an encouraging first result.
A much larger batch from the same area, about 1.7 tonnes, is now going through our onsite pilot plant. The site team has seen what it believes to be visible gold in every size fraction processed so far. The concentrates are being combined ahead of submission to an independent laboratory for assessment and gold recovery.
The plant’s gravity circuit uses the same density difference that makes gold panning possible. Pure gold is around seven times as dense as quartz, helping equipment separate liberated gold particles from lighter material. The resulting concentrate still needs further processing and analysis to establish its gold content.
Shaft 2 is one of three workstreams at Clogau. On the historic waste tip, where earlier trench samples were gold-bearing, we are sampling a number of locations first, so that any wider trenching can focus on the areas showing better grades. Underground at Jack Williams, the 29 samples from the Main Lode are being analysed to guide our choice of further targets.
Up to 50 tonnes or so of further floor material is estimated to be available around Shaft 2. Results from the floor material and waste tip, alongside geological analysis of the vein, will help direct the next round of work, using the mine access, team and plant we already have on site.
#ArkadianStrategicMetals #WelshGold