Alba Min Res PLC - Clogau Update - Phase 2 Underground Drilling
Released
Released
Announcement PDF
RNS Number : 3651Z
Alba Mineral Resources PLC
21 May 2021
Click on or paste the following link into your website browser to view the associated PDF
document (including maps and images): http://www.rns-
pdf.londonstockexchange.com/rns/3651Z_1-2021-5-20.pdf
Alba Mineral Resources plc
("Alba" or the "Company")
Clogau-St David's Gold Mine Update
Phase 2 Underground Drilling Commences
Alba Mineral Resources plc (AIM: ALBA) is pleased to announce that the second phase of
the Company's underground drilling programme at the Clogau-St David's Gold Mine
("Clogau" or the "Mine") has commenced.
Key Points
·
The start of Phase 2 underground diamond drilling at Clogau-St David's.
·
This follows the successful 559m Phase 1 underground drilling programme completed
in October 2020.
·
Phase 1 intersected what Alba believes to be the westerly, 550-metre extension of the
Clogau Main Lode, source of most historic production at Clogau-St David's Gold Mine.
·
The main focus of Phase 2 is to continue with the exploration and delineation of the
Main Lode to the north.
·
Phase 2 surface drilling is also progressing well, with two holes completed to date.
Alba's Executive Chairman, George Frangeskides, commented:
"We are delighted to be drilling underground again, following our successful Phase 1
underground drilling campaign which concluded last October. Meanwhile, Phase 2 of our
surface drilling continues to progress very well, with the first two completed holes intersecting the
projected lodes as predicted by our internal geological model. The continuity of the lodes at
depth is very encouraging news indeed."
"This is the first time we have drilled simultaneously both from the surface and underground at
Clogau-St David's. That is a measure of our determination to maximise the progress we make
during this spring/summer field season towards proving up zones for future gold production."
Phase 2 Underground Drilling
Alba is pleased to announce the start of Phase 2 underground diamond drilling at the
Clogau-St David's Gold Mine in north Wales. This second phase follows the successful
559m drilling programme which was completed at the end of October 2020. In that
programme, drill hole L002 intersected a quartz lode which returned a significant gold
value of 1.79 g/t over a width of 0.25 metres. Alba has interpreted this intersection as
belonging to the Jack Williams Lode, thus representing a projected 550-metre extension to
the Main Lode.
This Phase 2 programme is scheduled to comprise 12 holes drilled from 3 platforms for a
total of 1460m. The main focus of the programme is to continue with the exploration and
delineation of the Main Lode to the north - see Figure 1 in the PDF version of this RNS.
However, three holes will also be drilled to the south to test for a southern lode structure
the surface expression of which is marked by soil sample anomalies. Figure 2 (in the PDF
version of this RNS) is a 3D rendition of the drill programme with the expected intercepts
marked in yellow. Details of the drillholes are set out in Table 1.
Alba will undertake the programme employing its Kempe U3-9BQ Pneumatic drill
machine.
Table 1: Details of azimuth/dip and planned length/depth for each of the 12
planned drillholes. Depending on results and progress, these details may be
adjusted in the field.
Hole
GMOW_UG001
GMOW_UG002
GMOW_UG003
GMOW_UG004
GMOW_UG005
GMOW_UG006
GMOW_UG007
GMOW_UG008
GMOW_UG009
GMOW_UG010
GMOW_UG011
GMOW_UG012
Drill Pad
1
1
1
1
1
2
2
2
2
3
3
3
Azimuth
130
350
20
0
10
350
310
330
160
0
0
130
Total Metres
Dip
5
-10
10
5
-10
10
10
-10
5
-5
-25
-10
Depth
180
100
140
120
100
100
120
100
140
100
100
160
1460
Update on Phase 2 Surface Drilling
The commencement of the second phase of the surface drilling programme at the ClogauSt David's Gold Mine commenced on 12 April 2021 (see the Company's RNS of the same
date) and will consist of an 8-10 hole programme for around 2,000 metres in total. This
phase of drilling is targeting the 550m Main Lode extension indicated by the underground
drilling last year.
Initial intersections from the first two completed holes have been positive. Both holes (JW
001, final depth 240.3m, and JW 002, final depth 204.3m) intersected the projected lodes as
predicted. JW001 intersected the Main Lode extension at 34m and the Grandfathers Lode
extension at 190m. The Grandfathers intersection indicates that this lode extends for at
least 60m downdip. See Figures 4 and 5 in the PDF version of this RNS.
JW002 intersected the Main Lode extension at 95m and the 710 Lode extension at 190m
at about 40m below the Llechfraith Level. The continuity of the lodes at depth is very
encouraging from the perspective of increasing possible resources in the future. Both
lodes indicate a plunge toward the SW which is identical to the Llechfraith Lode drilled in
Phase 1. The third Phase 2 hole, JW003, has now started drilling.
This announcement contains inside information for the purposes of the UK Market
Abuse Regulation and the Directors of the Company are responsible for the release of
this announcement.
Glossary
7-10 Lode:
Borehole or
drillhole:
The 7-10 Lode is a parallel vein structure to the Main Lode, lying some 3040m to the south of the Main Lode. The whole of the Llechfraith Level is
developed on the 7-10 Lode.
A hole drilled into bedrock using a diamond-coated bit to return core
samples.
Grandfathers: Grandfathers or Grandfathers Lode is a pay-shoot within the 7-10 Lode.
Jack Williams: The Jack Williams Stope is the most westerly mined portion of the Main Lode
on the Ty'n-y-Cornel Level.
Intercept:
A section of core in which a target lithology, structure or significant assay
result has been identified.
Main Lode:
The main quartz vein structure along which the majority of historic mining
took place at Clogau-St David's. The Main Lode was mined from the Jack
Williams Stope for approximately 300m eastwards to the Bryntirion Fault,
on the other side of which it was mined over a strike of at least 150m at
the St David's Mine.
Mineralisation: Any single mineral or combination of minerals occurring in a mass, or
deposit, of economic interest. The term is intended to cover all forms in
which mineralisation might occur, whether by class of deposit, mode of
occurrence, genesis or composition.
Quartz vein: A sheet-like body consisting predominantly of the mineral quartz, which is
known to host gold mineralisation in the Dolgellau Gold Belt.
Stope:
A mined-out area along a lode structure from which ore has been extracted.
Forward Looking Statements
This announcement contains forward-looking statements relating to expected or
anticipated future events and anticipated results that are forward-looking in nature and,
as a result, are subject to certain risks and uncertainties, such as general economic,
market and business conditions, competition for qualified staff, the regulatory process
and actions, technical issues, new legislation, uncertainties resulting from potential delays
or changes in plans, uncertainties resulting from working in a new political jurisdiction,
uncertainties regarding the results of exploration, uncertainties regarding the timing and
granting of prospecting rights, uncertainties regarding the timing and granting of
regulatory and other third party consents and approvals, uncertainties regarding the
Company's or any third party's ability to execute and implement future plans, and the
occurrence of unexpected events.
Without prejudice to the generality of the foregoing, uncertainties also exist in connection
with the ongoing Coronavirus (COVID-19) pandemic which may result in further lockdown
measures and restrictions being imposed by Governments and other competent
regulatory bodies and agencies from time to time in response to the pandemic, which
measures and restrictions may prevent or inhibit the Company from executing its work
activities according to the timelines set out in this announcement or indeed from
executing its work activities at all. The Coronavirus (COVID-19) pandemic may also affect
the Company's ability to execute its work activities due to personnel and contractors
testing positive for COVID-19 or otherwise being required to self-isolate from time to time.
Actual results achieved may vary from the information provided herein as a result of
numerous known and unknown risks and uncertainties and other factors.
Competent Person Declaration
The information in this release that relates to Exploration Results has been reviewed by
Mr Mark Austin. Mr Austin is a member of SACNASP (Reg. No. 400235/06), Fellow of The
Geological Society and Fellow of the Geological Society of South Africa. He has a B.Sc.
Honours in Geology with 38 years' experience.
Mark Austin has sufficient experience that is relevant to the style of mineralisation and
type of deposit under consideration and to the activity being undertaken to qualify as a
Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting
of Exploration targets, Exploration Results, Mineral Resources and Ore Reserves', also
known as the JORC Code. The JORC code is a national reporting organisation that is
aligned with CRIRSCO. Mr Austin consents to the inclusion in the announcement of the
matters based on his information in the form and context in which they appear.
For further information, please contact:
Alba Mineral Resources plc
George Frangeskides, Executive Chairman
+44 20 3950 0725
Cairn Financial Advisers LLP (Nomad)
James Caithie / Liam Murray
+44 20 7213 0880
ETX Capital (Broker)
Thomas Smith
+44 20 7392 1494
Alba's Project and Investment Portfolio
Project (commodity)
Location
Ownership
Amitsoq (graphite)
Greenland
90%
Clogau (gold)
Wales
90%
Gwynfynydd (gold)
Wales
100%
Inglefield (copper, cobalt, gold)
Greenland
100%
Limerick (zinc-lead)
Ireland
100%
Melville Bay (iron ore)
Greenland
51%
Mining Projects
TBS (ilmenite)
Greenland
100%
Brockham (oil)
England
5%
Horse Hill (oil)
England
11.765%
Oil & Gas Investments
This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the
Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions
relating to the use and distribution of this information may apply. For further information, please contact
rns@lseg.com or visit www.rns.com.
RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with
the information contained in this communication, and to share such analysis on an anonymised basis with others as
part of our commercial services. For further information about how RNS and the London Stock Exchange use the
personal data you provide us, please see our Privacy Policy.
END
UPDURSRRAOUVUUR
Share your feedback
Discover