Clogau-St David's Gold Mine Update
Phase 2 Surface Drilling Completed
Alba Mineral Resources plc (AIM: ALBA) is pleased to provide an update on its ongoing
activities at the Clogau-St David's Gold Mine ("Clogau" or the "Mine").
Key Points
Phase 2 Surface Drilling Completed
·
Ten holes drilled for 1,475.6 m. All holes to date have intersected the Main Lode
Extension.
·
JW008 intercepted the best developed example of the Main Lode extension including
an intercept of ~3.40 m from ~49.90 m.
·
Galena has been identified in this intercept, an indicator mineral for gold-bearing veins
and previously associated with high gold grades.
·
Main Lode Extension now projected to have strike length of 585 m and a depth extent
of 63 m below surface.
·
Targets below Grandfathers and 7-10 Lodes also successfully intersected, with the
Grandfathers Extension now being projected to measure approximately 57.6m and
the 7-10 Extension 30m.
Phase 2 Underground Drilling
·
Three underground holes drilled, two successfully intersecting the Main Lode
Extension north of the Llechfraith adit.
Dewatering Llechfraith Shaft
·
Permit applications progressing well.
Mine Development
· Next steps will be to undertake technical and engineering studies to assess the optimal
means to access the gold targets defined by Alba's drilling.
Alba's Executive Chairman, George Frangeskides, commented:
"The key objective of this second phase of surface drilling at Clogau-St David's was to prove up
the continuity of the Main Lode Extension we had identified during the drilling at the end of last
year. We have now delivered emphatically on that aim, by intersecting the Main Lode Extension
on every one of the 10 holes we have drilled in this phase. We are now projecting the Main Lode
Extension to have a strike extent of 585 m and a depth extent of up to 63 m. This is shaping up to
be a significant target."
"As we approach the end of this phase of drilling, we will be focusing next on a detailed technical
and engineering evaluation of the most efficient access routes to the key gold targets we have
identified through our drilling, namely the Llechfraith Lode, Main Lode Extension, Grandfathers
Extension and 7-10 Extension."
Completion of Phase 2 Surface Drilling
The Phase 2 Surface Drilling Programme at Clogau-St David's, which commenced in April
2021, has now been completed. A total of ten holes have been drilled for a total of 1,475.6
metres.
The Phase 2 programme was designed to confirm the continuity of the westerly, potential
550-metre extension of the Clogau Main Lode (the "Main Lode Extension") which Alba
identified during its October 2020 underground drilling. The significance of such a
discovery is that the Main Lode is the source of most historic production at the Mine. If
the continuity of the Main Lode Extension could be confirmed, this would become a
primary zone for underground development and extraction.
All holes have successfully intersected the Main Lode Extension. As seen in Figure 1 (in the
PDF version of this RNS), the Main Lode Extension is now projected to have a strike extent
of 585 metres, and a depth extent of 63 metres below surface at its widest point.
In relation to the other zones targeted during this Phase 2 drilling, namely the depth
extensions to the Grandfathers Lode ("Grandfathers Extension") and to the 7-10 Lode ("710 Extension"), holes JW001 and JW006 both intersected the Grandfathers Lode below the
Llechfraith Level. It should also be noted that the bulk sampling from Grandfathers
returned the highest value concentrates with values up to 461 g/t. Holes JW002 (2.0m at
171m) and JW010 (4.5m at 119m) intersected thick quartz veining below the 7-10 Lode.
These intersections are considered to represent extensions of the Grandfathers and 7-10
Lodes systems and thus justify further exploration. Both existing Lodes are significant
targets, with Grandfathers measuring approximately 80m on strike and 7-10
approximately 90m (see Figure 1 in the PDF version of this RNS). The drilling beneath
these Lodes has now confirmed continuity of these Lodes below the existing Llechfraith
level, some 57.6m beneath Grandfathers, and some 30m beneath 7-10.
For illustration, the intercepts from JW001-4 can be seen in Figure 2 (in the PDF version of
this RNS).
One of the most recently drilled holes, JW008, was drilled to intercept the lode in between
JW002 and JW003 in the eastern portion of the drilling programme. JW008 intercepted the
best developed example of the Main Lode extension at approximately 10 m west of the
intersection in JW002, which is also relatively well developed in terms of thickness.
Preliminary observations indicate an intercept of ~3.40 m from ~49.90 m in JW008, which is
preceded by a ~0.80 m intercept at ~49.00 m downhole (see Figure 4 in the PDF version of
this RNS).
Galena has been identified in the intercept in JW008. This is an indicator mineral for goldbearing veins and in the past has been associated with high gold grades in the John
Hughes lode, an offshoot from the Main Lode/Jack Williams target structure.
JW009 was drilled on the same azimuth but at a slightly steeper angle to try and ascertain
whether this thick intercept marked the development of a previously unidentified
payshoot. JW009 did intersect the lode, which was similar in size to the intercept in JW002.
Initial core observations show a ~0.60 m intercept from ~109.70 m and a second ~0.70 m
from ~111.40 m. This may suggest that the thickest section of the lode (i.e. the intercept in
JW008) plunges to the south-west within the main vein structure itself, a phenomenon
which has been historically observed elsewhere at Clogau.
JW010 was drilled slightly to the west of JW008 and was completed at 123.60 m. This final
hole intercepted a relatively diffuse example of the Main Lode extension with stringer
zones at ~36 and 48 m. This clearly indicates that the potential payshoot identified in
JW008 pinches to the west before the intersection of JW010, whilst remaining open east of
JW002 in which there is still notable mineralisation (see Figure 2 in the PDF version of this
RNS). Prior to completing JW010, the hole encountered further diffuse stringers over ~4-5
m from ~119.00 m. These are thought to show a branch of the 7-10 Lode which has seen
minor trial development on the Llechfraith Level.
Alba's technical team will now concentrate on integrating the results of Phase 2 into the
Company's geological model for Clogau-St David's, as well as cutting and assaying the core
for gold content.
Table 1: Phase 2 Surface Drilling: Key Structural Intercepts
Hole
GMOW_
JW001
GMOW_
JW002
GMOW_
JW003
Azimuth
177.5
120
143.6
Dip
-42.9
-45
-55.2
Length
(m)
240.30
204.30
115.00
Lode Classification
Structural
Intercepts
Structure
Lode Name
Depth
Thickness
(m)
Quartz
Vein
Main Lode
Extension
33.78
0.98
Quartz
Vein
Unnamed
Lode
164.20
0.52
Quartz
Vein
Unnamed
Lode
168.60
0.75
Quartz
Stringer
Network
Grandfathers
187.60
0.95
Quartz
Stringer
Network
Unnamed
Lode
190.00
8.00
Quartz
Vein
Unnamed
Lode
202.00
2.00
Quartz
Vein
Main Lode
Extension
offshoot
94.32
0.24
Quartz
Vein
Main Lode
Extension
94.87
0.95
Quartz
Stringer
Network
7-10 Lode
171.00
2.00
Quartz
Vein
Main Lode
Extension
89.36
0.81
Hole
Azimuth
Dip
Length
(m)
Lode Classification
Structural
Intercepts
Quartz
Vein
Main Lode
Extension
offshoot
90.34
0.17
GMOW_
JW004
165.2
-46
205.40
Quartz
Vein
Main Lode
Extension
35.08
0.93
GMOW_
JW005
166.1
-55.4
108.00
Quartz
Vein
Main Lode
Extension
87.50
0.65
Quartz
Vein
Main Lode
Extension
38.00
0.05
Quartz
Stringer
Network
Grandfathers
121.00
0.30
Quartz
Vein
Main Lode
Extension
79.40
0.30
Quartz
Stringer
Network
Unnamed
Lode
92.00
0.75
Quartz
Vein
Main Lode
Extension
offshoot
48.20
0.25
Quartz
Vein
Main Lode
Extension
offshoot
49.00
0.80
Quartz
Vein
Main Lode
Extension
49.90
3.40
Quartz
Vein
Main Lode
Extension
offshoot
109.70
0.60
Quartz
Vein
Main Lode
Extension
111.40
0.70
Quartz
Stringer
Network
Main Lode
Extension
36.10
0.20
GMOW_
JW006
GMOW_
JW007
GMOW_
JW008
GMOW_
JW009
GMOW_
JW010
154.2
154
130
130
120
-44.1
-55
-45
-55
-45
189.00
94.00
69.00
127.00
123.60
Hole
Azimuth
Dip
Length
(m)
Structural
Intercepts
Lode Classification
Quartz
Stringer
Network
7-10 Lode
branch
119.00
4.50
Update on Phase 2 Underground Drilling
To date, three drill holes have been completed in the Phase 2 Underground Drilling
Programme.
Drill holes UG002 and UG003 were drilled in a northerly direction, and both intercepted
the Main Lode extension, adding critical data on how this structure behaves in 3D. The
drill trace for UG002 is shown in Figure 3 (in the PDF version of this RNS).
Both holes show relatively diffuse mineralisation, with the target structure presenting as
two intercepts (0.18 m @ 86.08 m and 0.24 m @ 87.36 m) in UG002. In UG003 the first
indications of the Lode system occur at ~87.70 m (~0.20 m thick), however the hole was
deepened and encountered further mineralisation at ~106.90 m with a prominent stringer
zone at ~108.90m for ~0.40 m with the last intercept (~0.10 m thick) in this zone finishing
at 109.58 m. This indicates that there has been a split in the Main Lode extension into two
branches which remains to be defined by UG004 and UG005 from the current drill pad.
Drill hole UG001 was targeted to the south of the Llechfraith workings in order to
intercept potential target structures for future drilling programmes, and despite
intercepting a 0.99 m thick mineralised zone from 42.24 m (analogous to the Canol Vein
System from the Phase 1 Surface Drilling Programme), technical difficulties meant that the
hole could not reach far enough to intercept a possible extension of the Sill Vein System.
The drill trace for UG001 is shown in Figure 3 (in the PDF version of this RNS). Alba is
confident that the additional holes planned to the south from the remaining two drill
pads will be able to intersect this target and provide further critical data for Alba's
geological model.
The underground drilling programme is currently paused but expected to resume again in
due course. A further update will be provided on completion of the programme.
Table 2: Phase 2 Underground Drilling: Key Structural Intercepts
Hole
GMOW_
UG001
GMOW_
UG002
Azimuth
Dip
Length
(m)
127.3
-7.0
142.00
350.0
-10
93.60
Lode Classification
Structural
Intercepts
Structure
Lode
Name
Depth
Thickness
(m)
Quartz Vein
Unnamed
Lode
42.24
0.99
Quartz Vein
Main Lode
Extension
86.08
0.18
Hole
Azimuth
GMOW_
UG003
0.0
Dip
-7.0
Length
(m)
Lode Classification
Structural
Intercepts
Quartz
Stringer
Network
Main Lode
Extension
87.36
0.24
Quartz
Stringer
Network
Main Lode
Extension
87.70
0.20
Quartz Vein
Main Lode
Extension
106.90
0.25
108.90
0.40
109.58
0.10
114.00
Quartz
Stringer
Network
Quartz Vein
Main Lode
Extension
Main Lode
Extension
Dewatering of Llechfraith Shaft
As previously advised, Alba has applied to the competent regulator, Natural Resources
Wales, for permission to divert the drainage water from the current Llechfraith drainage
adit and to dewater the lower workings in the Llechfraith Shaft, in order to undertake
underground drilling and bulk sampling directly from that zone.
Two permits have been applied for, a Transfer Permit which allows for the dewatering of
the Llechfraith Shaft and the water to be transferred to a water treatment plant which will
be established at the mine site, and a Discharge Permit which allows for the water to be
discharged into a water course. All pumped water will be treated with flocculant and
passed through a clarifier to remove any silt. Samples of the treated water will be sent for
laboratory analysis throughout the dewatering process.
Alba is confident that the application process for the Discharge and Transfer Permits will
be concluded shortly and the permits issued. As and when the permits are issued, it is
expected that the dewatering of the Llechfraith Shaft will take around two weeks, after
which Alba's technical team will be able to access the lower levels and assess the exposed
lode. After dewatering, and while this exploration work is being undertaken, a constant
discharge will be maintained in order to ensure dry workings.
By way of a recap, the Company regards the Llechfraith Lode, incorporating the
Llechfraith Shaft, as a key target for future mining operations, not least given the positive
results of the Phase 1 Surface Drilling Programme (see the Company's RNSs of 2 and 12
March 2021). At its deepest point, the Phase 1 drilling intersected the Llechfraith Lode
structure 122 metres below the existing Llechfraith mine workings. Alba's initial geological
modelling indicates that the total tonnage estimation for this newly identified lode
structure is between 24,000 to 27,000 tonnes in the Lower Lode alone.
Next Steps
As we approach the end of this phase of drilling, the Company will be moving into a
detailed evaluation of the optimal means to access the key target zones which have been
identified from the completed drilling phases, in particular the Llechfraith Lode, Main
Lode Extension, Grandfathers Extension and 7-10 Extension. This evaluation will be
undertaken by Alba's technical team, headed by Senior Geologist and COO Mark Austin,
with specialist input from Alba's preferred mining, geotechnical and confined space
engineering contractors.
This announcement contains inside information for the purposes of the UK Market
Abuse Regulation and the Directors of the Company are responsible for the release of
this announcement.
Glossary
7-10 Lode:
Borehole or
drillhole:
The 7-10 Lode is a parallel vein structure to the Main Lode, lying some 3040m to the south of the Main Lode. The whole of the Llechfraith Level is
developed on the 7-10 Lode.
A hole drilled into bedrock using a diamond-coated bit to return core
samples.
Grandfathers: Grandfathers or Grandfathers Lode is a pay-shoot within the 7-10 Lode.
Jack Williams: The Jack Williams Stope is the most westerly mined portion of the Main Lode
on the Ty'n-y-Cornel Level.
Intercept:
A section of core in which a target lithology, structure or significant assay
result has been identified.
Main Lode:
The main quartz vein structure along which the majority of historic mining
took place at Clogau-St David's. The Main Lode was mined from the Jack
Williams Stope for approximately 300m eastwards to the Bryntirion Fault,
on the other side of which it was mined over a strike of at least 150m at
the St David's Mine.
Mineralisation: Any single mineral or combination of minerals occurring in a mass, or
deposit, of economic interest. The term is intended to cover all forms in
which mineralisation might occur, whether by class of deposit, mode of
occurrence, genesis or composition.
Quartz vein: A sheet-like body consisting predominantly of the mineral quartz, which is
known to host gold mineralisation in the Dolgellau Gold Belt.
Stope:
A mined-out area along a lode structure from which ore has been extracted.
Forward Looking Statements
This announcement contains forward-looking statements relating to expected or
anticipated future events and anticipated results that are forward-looking in nature and,
as a result, are subject to certain risks and uncertainties, such as general economic,
market and business conditions, competition for qualified staff, the regulatory process
and actions, technical issues, new legislation, uncertainties resulting from potential delays
or changes in plans, uncertainties resulting from working in a new political jurisdiction,
uncertainties regarding the results of exploration, uncertainties regarding the timing and
granting of prospecting rights, uncertainties regarding the timing and granting of
regulatory and other third party consents and approvals, uncertainties regarding the
Company's or any third party's ability to execute and implement future plans, and the
occurrence of unexpected events.
Without prejudice to the generality of the foregoing, uncertainties also exist in connection
with the ongoing Coronavirus (COVID-19) pandemic which may result in further lockdown
measures and restrictions being imposed by Governments and other competent
regulatory bodies and agencies from time to time in response to the pandemic, which
measures and restrictions may prevent or inhibit the Company from executing its work
activities according to the timelines set out in this announcement or indeed from
executing its work activities at all. The Coronavirus (COVID-19) pandemic may also affect
the Company's ability to execute its work activities due to personnel and contractors
testing positive for COVID-19 or otherwise being required to self-isolate from time to time.
Actual results achieved may vary from the information provided herein as a result of
numerous known and unknown risks and uncertainties and other factors.
Competent Person Declaration
The information in this release that relates to Exploration Results has been reviewed by
Mr Mark Austin. Mr Austin is a member of SACNASP (Reg. No. 400235/06), Fellow of The
Geological Society and Fellow of the Geological Society of South Africa. He has a B.Sc.
Honours in Geology with 38 years' experience.
Mark Austin has sufficient experience that is relevant to the style of mineralisation and
type of deposit under consideration and to the activity being undertaken to qualify as a
Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting
of Exploration targets, Exploration Results, Mineral Resources and Ore Reserves', also
known as the JORC Code. The JORC code is a national reporting organisation that is
aligned with CRIRSCO. Mr Austin consents to the inclusion in the announcement of the
matters based on his information in the form and context in which they appear.
For further information, please contact:
Alba Mineral Resources plc
George Frangeskides, Executive Chairman
+44 20 3950 0725
Cairn Financial Advisers LLP (Nomad)
James Caithie / Liam Murray
+44 20 7213 0880
ETX Capital (Broker)
Thomas Smith
+44 20 7392 1494
Alba's Project and Investment Portfolio
Project (commodity)
Location
Ownership
Greenland
90%
Mining Projects
Amitsoq (graphite)
Clogau (gold)
Wales
90%
Gwynfynydd (gold)
Wales
100%
Inglefield (copper, cobalt, gold)
Greenland
100%
Limerick (zinc-lead)
Ireland
100%
Melville Bay (iron ore)
Greenland
51%
TBS (ilmenite)
Greenland
100%
England
11.765%
Oil & Gas Investments
Horse Hill (oil)
This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the
Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions
relating to the use and distribution of this information may apply. For further information, please contact
rns@lseg.com or visit www.rns.com.
RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with
the information contained in this communication, and to share such analysis on an anonymised basis with others as
part of our commercial services. For further information about how RNS and the London Stock Exchange use the
personal data you provide us, please see our Privacy Policy.
END
DRLDDGDRLXBDGBI
Share your feedback
Discover