Alba Min Res PLC - Horse Hill Update
Released
Released
Announcement PDF
RNS Number : 6228Q
Alba Mineral Resources PLC
22 October 2019
Alba Mineral Resources plc
("Alba" or the "Company")
Horse Hill Oil Field: HH-2 Pilot Completed, HH-2z Horizontal Trajectory
Underway
Alba Mineral Resources plc (AIM: ALBA), the diversified mineral exploration and
development company, is pleased to announce that it has received the following
update from UK Oil & Gas Plc ("UKOG"), the majority owner of Horse Hill
Developments Limited ("HHDL"), the operator of Horse Hill licences PEDL 137 and
PEDL 246 in which Alba has an 11.765% interest:
-
Following the successful completion of the Horse Hill-2 ("HH-2") Portland pilot
well, Horse Hill-2z ("HH-2z") horizontal drilling operations are now underway.
HH-2z aims to deliver a circa 3,200 ft horizontal section wholly within the
Portland reservoir's most oil productive zone, the presence and quality of
which has been further defined by the pilot well's coring and electric logging
programmes as reported by UKOG.
-
HH-2/2z, the first horizontal well in the field's Portland oil pool, is designed to
be retained as a future production well and to deliver flow rates significantly
higher than the rates achieved from the HH-1 vertical Portland discovery
well. Following a planned extensive HH-2z EWT campaign, both HH-2z
Portland and the HH-1 Kimmeridge well are expected to be put into long
term production by the end of 2019.
-
HH-2z operations:
o HH-2z operations were initiated through the pilot well's 9⅝" casing at
the planned "kick-off" point 1320 ft below rig floor, immediately above
cement plugs isolating the Portland reservoir below. The well is now
building angle towards the horizontal within 8½" diameter hole and
will continue down to a drilled depth of around 2300 ft, just above the
Portland target zone. This section will then be cased and cemented
with a 7" liner.
o
The well's trajectory will then continue within 6" diameter hole,
entering the Portland target zone approximately 850 ft to the
southeast of the HH-2 surface location. HH-2z's expected total
measured depth is around 5900 ft from rig floor, of which c. 3200 ft is
planned within the reservoir's sweet-spot. The well is expected to
reach its total depth around mid-November.
o To ensure the borehole remains wholly within the Portland sweet spot,
HH-2z will be actively "geo-steered" during drilling to keep within a
series of core and electric log-derived diagnostic geological markers
delineating the zone's upper and lower boundaries.
The information contained within this announcement is deemed by the
Company to constitute inside information under the Market Abuse Regulation
(EU) No. 596/2014.
Forward Looking Statements
This announcement contains forward-looking statements relating to expected or
anticipated future events and anticipated results that are forward-looking in
nature and, as a result, are subject to certain risks and uncertainties, such as
general economic, market and business conditions, competition for qualified
staff, the regulatory process and actions, technical issues, new legislation,
uncertainties resulting from potential delays or changes in plans, uncertainties
resulting from working in a new political jurisdiction, uncertainties regarding the
results of exploration, uncertainties regarding the timing and granting of
prospecting rights, uncertainties regarding the Company's or any third party's
ability to execute and implement future plans, and the occurrence of
unexpected events. Actual results achieved may vary from the information
provided herein as a result of numerous known and unknown risks and
uncertainties and other factors.
Qualified Person's Statement
The technical information contained in this announcement has been reviewed
and approved by Feroz Sultan (B.Sc (Hons) Geology, M.Sc, Petroleum and
Structural Geology, Karachi and M.Sc Petroleum Geology, Imperial College
London), a petroleum geologist with over 45 years' experience in the
management, exploration, development and production of oil and gas.
For further information, please contact:
Alba Mineral Resources plc
George Frangeskides, Executive Chairman
+44 20 3907 4297
Cairn Financial Advisers LLP (Nomad)
James Caithie / Liam
Murray
+44 20 7213 0880
First Equity Limited (Broker)
Jason Robertson
+44 20 7374 2212
Yellow Jersey PR (Financial PR/ IR)
Sarah Hollins/Harriet Jackson/Henry Wilkinson
alba@yellowjerseypr.com
+44 20 3004 9512
Alba's Project and Investment Portfolio
Project (commodity)
Mining Projects
Location
Ownership
Amitsoq (graphite)
Greenland
90%
Clogau (gold)
Wales
90%
Inglefield (copper, cobalt, gold)
Greenland
100%
Limerick (zinc-lead)
Ireland
100%
Melville Bay (iron ore)
Greenland
51%
TBS (ilmenite)
Greenland
100%
Brockham (oil)
England
5%
Horse Hill (oil)
England
11.765%
Oil & Gas Investments
This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the
Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions
relating to the use and distribution of this information may apply. For further information, please contact
rns@lseg.com or visit www.rns.com.
END
UPDLLFFTIFLLFIA
Share your feedback
Discover